In a very short construction period of only a few months spanning 2014-15, up to 50 Kreutzpointner building services technicians completed the electrical installations for the 42,000 m2 floor area of the Netto logistics centre in Erharting (Altötting district/Bavaria). Around 250 km of cable and wiring runs, 2,400 lights and 1,100 data connections were installed, as well as the electrical supply for a 30 m tall high bay warehouse.
Elektro Kreutzpointner provided not only the complete power supply system, but also the sub-distribution boards for this large project: the Burghausen-based switchgear construction company produced 25 units for the logistics centre.
Power distribution
General electrical engineering
Safety engineering
Communications technology
Network engineering
Switchgear construction